Experience
|
|
1987 - present
|
Teknisk Design A/S
|
|
Oct 09 - Present
|
Client: AF Decom / Ekofisk EPRD project
Design of topside modules on FPSO
Assigned as structural specialist engineer during detail design engineering of Offshore Hook Down and Disposal Engineering Vats Site
|
|
Sept 07 - Oct 09
|
Client: Aker Solutions / Idun/Skarv topside project
Design of topside modules on FPSO
Assigned as Specialist engineer outfitting structures
|
|
Feb 06 - Dec 07
|
Client: Aker Kværner E & T / H-6e project
Topside structure
Assigned as specialist engineer
Design of deck houses and major equipment support structures with interface tasks towards drilling rig construction team.
The design has been done with extended use of STAADPro programme package for analysis, and PDMS 3D-model for design including checking activities up to IFC-drawings.
|
|
Feb 06 - May 06
|
Client: Technip Offshore Norge A/S / Shtokman Consept Study
Structural responsible engineer in the SPAR topside design team
|
|
Oct 04 - May 07
|
Client: AF Decom / Ekofisk 2/4T Demolition project
Removal of Topside structures
Assigned as structural responsible engineer during detail design engineering and follow on period
Structural verification of platform structures for load from demolition machinery and crawler crane. Design of dedicated load distribution platforms on top of deck structures
Dropped object consequence report and recommendations for possible protective actions to minimize consequences of dropped items
Design of dedicated container trolley for use on the platform
Sea fastening and lifting design reports for machinery and equipment to be transported to and from the Ekofisk tank
Structural responsibility of special operations during the demolition process requiring stability and/or capacity verification design reports
In addition structural responsible for several land based demolition tasks with special attention to structural stability and risk of human life and/or material damage with major cost consequences:
Ikea Slependen
Norsk Hydro Høyanger
Norsk Hydro Årdalstangen
|
|
December 03 - May 05 (Part time in 2005)
|
Client: Aker Kværner E & T / Tyrihans project
Kristin topside modification
Assigned as structural responsible for outfitting structures.
|
|
April 02 - December 03
|
Client: Aker Kværner Engineering / Kristin project
Topside structure
Assigned as Specialist Engineer
Grop lead process module / responsible for:
Secondary and outfitting structures.
Equipment support design.
The design has been done with extended use of STAADPro programme package for analysis, and PDMS 3D-model for design including checking activities up to AFC-drawings.
|
|
October 01 - March 02
|
Client: ABB Offshore Systems / Kvitebjørn project
Structural responsible for study work related to replacement of export pump package on Kvitebjørn platform topside structure. Also participating in design work for the structural group related to hook-up activities for different structures.
|
|
March 01 - August 03
|
Client: Kværner Oil & Gas / Mikkel project
Åsgard B Modification
Assigned as structural responsible (part-time)
|
|
Sept 00 - Sept 01
|
Client: Kværner Oil & Gas / Grane project
Topside Structure
Assigned as specialist engineer
|
|
May 97 - Sept 00
|
Client: Kværner Oil & Gas / Åsgard B project
Central Engineering Team
Assigned as specialist engineer
May 97 - April 99: Structural group upper hull
May 99 - March 00: Structural group
Field design / follow on engineering
|
|
Dec. 97 - April 98
|
Client: Kværner Maritime / Ocean Confidence
Design assistance / main scantling work of deck and bulkhead structure
with main task to verify the global buckling capacity.
|
|
July 96 - May 97
|
Client: Kværner Engineering / Oseberg Øst project Topside structure
Assigned as specialist engineer
|
|
Aug. 95 - Sept. 96
|
Client: Kværner Engineering / Ekofisk II project Main Support Frame
|
|
Nov. 94 - July 95
|
Client: Kværner Family Venture / Norne project
Gas Compression package EPC contract
|
|
Aug. 94 - Nov. 94
|
Client: Kværner Concrete Construction / Njord project
Design development / main scantling of deck structure for a concrete semi.
|
|
June 93 - Sept. 94
|
Client: Kværner Engineering / Sleipner Vest project
Modules M11 and M12
|
|
Aug. 91 - July 93
|
Client: Aker Engineering / Troll Gass project
Topside structure
|
|
Feb. 91 - Sept. 91
|
Client: Kværner Engineering / Brage project
M10 - Production module
|
|
Apr. 88 - Oct. 92
|
Client: Aker Engineering / Snorre project
Topside and Hull structures
|
|
1987 - 1994
|
Client: Kværner Energy, Oslo
|
|
Structural design / calculations for miscellaneous steel structures.
|
|
1985 - 1987
|
ACN - Articulated Columns Norway A.S
|
|
1987
|
Project Manager
Gullfaks SPM Post-Engineering.
Client: Statoil
|
|
1986
|
Engineering Manager, ACN.
Project Manager.
Draugen Field Engineering Studies.
Client: A/S Norske Shell.
|
|
1985
|
Senior structural engineer.
Gullfaks SPM Post-Engineering.
Client: Statoil
|
|
1985
|
Project Engineer
Statfjord "A" SPM Project.
Client: Statoil
|
|
1973 - 1985
|
: Kværner Brug A/S
|
|
1982 - 1985
|
Deputy General Manager, Engineering / Construction and Offshore Division
Direct involvement in following projects:
1984: Kværner Flowline Joint Venture
1983 - 1984: Nordsjøhallen Haugesund
1982 - 1983: Textile factory complex Morogoro Tanzania
|
|
1978 - 1982
|
Deputy General Manager, Steel construction division
Direct involvement in following projects:
1981 - 1982: Statfjord "C" - GBS
1978 - 1979: Statfjord "B" - Truss structure
1977: Statfjord "A" -ALP
|
|
1975 - 1977
|
Department Manager, Steel construction division
|
|
1973 - 1974
|
Project Engineer, Steel construction division.
|
|
1971 - 1973
|
Sivilingeniør Elliot Strømme A/S
Project Engineer, Structural steel division
|