Experience
|
|
1987 - present
|
Teknisk Design A/S
|
|
May 97 -
|
Client: Kværner Oil & Gas / Åsgard B project
Central Engineering Team
Assigned as specialist engineer
May 97 - April 99: Structural group upper hull
Responsible for:
Deck structure design
Equipment support design
Discipline coordinator for vendor documents IDC-work
May 99 -: Structural group
Field design / follow on engineering
|
|
Dec. 97 - April 98
|
Client: Kværner Maritime / Ocean Confidence
Design assistance / main scantling work of deck and bulkhead structure
with main task to verify the global buckling capacity.
|
|
July 96 - May 97
|
Client: Kværner Engineering / Oseberg Øst project Topside structure
Assigned as specialist engineer
|
|
|
Responsible for:
Secondary and outfitting structures design
Equipment support design
|
|
Aug. 95 - Sept. 96
|
Client: Kværner Engineering / Ekofisk II project Main Support Frame
Assigned as specialist engineer
|
|
|
Responsible for:
Deck structure design
Equipment support design
Hook-up design of caissons etc. between MSF and Jacket
Discipline coordinator for equipment support design
Discipline coordinator for vendor documents IDC-work
|
|
Nov. 94 - July 95
|
Client: Kværner Family Venture / Norne project
Gas Compression package EPC contract Assigned as specialist engineer
|
|
|
Responsible for:
Design of the modules deck structure and outfitting structures
"Follow up" of equipment information with respect to structural interface
Interdiscipline coordination
|
|
Aug. 94 - Nov. 94
|
Client: Kværner Concrete Construction / Njord project
Design development / main scantling of deck structure for a concrete semi
|
|
June 93 - Sept. 94
|
Client: Kværner Engineering / Sleipner Vest project
Modules M11 and M12
Assigned as senior engineer
|
|
|
Responsible for:
Design of the internal deck structures including equipment supports, pipe supports /
pipe racks, runway beams / lifting lugs, access platforms
Interdiscipline work
Discipline responsibility for commenting on, and filing of supplier documents
Design reports
|
|
Aug. 91 - July 93
|
Client: Aker Engineering / Troll Gass project
Topside structure
Assigned as senior engineer
1991: Preengineering stage I
1991-1993: Detail engineering stage II
1993: Follow on engineering stage III
|
|
|
Design responsibility for external areas including stairtowers and equipment supports
Interdiscipline work
Assistance to site team solving fabrication queries
|
|
Feb. 91 - Sept. 91
|
Client: Kværner Engineering / Brage project
M10 - Production module
Assigned as senior engineer
|
|
|
Responsible for the design of external areas including equipment supports,
access platforms, external piperacks.
Interdiscipline work
Detail design reports
|
|
Apr. 88 - Oct. 92
|
Client: Aker Engineering / Snorre project
Topside and Hull structures
Assigned as senior engineer
Apr. - Aug. 1988: Structural group Topsides
Design of secondary deck structures
Aug. 1988 - June 1989: Structural group Hull
Responsible for engineering of secondary and outfitting structures
throughout the Hull including interdiscipline responsibility.
Partisipating in work with detail design reports for various main
structures of the Hull.
July 1989 - Jan. 1991: Structural group
Follow on engineering
Responsible for writing the design resume for Hull and Well Template
Febr. 1991 - Oct. 1992: Snorre PT
(parttime available - structural group)
Follow on engineering during fabrication period, inshore period, tow out
and offshore completion.
Punch out activities w.r.t. seafastening of components in the mooring
compartment before tow out.
Close out activities
|
|
1987 - 1994
|
Client: Kværner Energy, Oslo
|
|
|
Structural design / shopdrawing work for miscellaneous steel building
structures.
Design work / calculations of single skid support frames for gas turbine
generator packages for installation on offshore platforms.
Design work / verification of system spring values for different GE gas
turbine support structures.
|
|
1985 - 1987
|
: ACN - Articulated Columns Norway A.S
|
|
1987
|
: Project Manager
Gullfaks SPM Post-Engineering.
Client: Statoil
Responsible for the daily administration and management of the post-engineering
project in its final phase including complete close out documentation for
technical and financial matters.
|
|
1986
|
: Engineering Manager.
Responsible for management of engineering resources within ACN. In particular
responsible for the efficient use of manpower cooperating with the project managers
regarding assignment and demobilization of engineering personnel to match workload.
From 1987 responsible for the technical management within ACN together with the
Technical Manager.
: Project Manager.
Draugen Field Engineering Studies.
Client: A/S Norske Shell.
Responsible for conceptual studies for a Floating Production Storage and Offloading unit,
a Floating Storage and Offloading unit and a Floating Loading Platform.
|
|
1985
|
: Senior structural engineer.
Gullfaks SPM Post-Engineering.
Client: Statoil
Responsible for the structural engineering discipline.
|
|
1985
|
: Project Engineer
Statfjord "A" SPM Project.
Client: Statoil
Responsible for the technical part of the tender for a new SPM loading platform
on the Statfjord field, being a potential turn-key delivery with ACN as main
contractor. Due to very short delivery time, much effort was put in producing engineering
documents during the tender period. During tender clarification period - up to
december 1985, it was continously worked on the documentation, completing engineering
documents including document list and reporting format.
|
|
1973 - 1985
|
: Kværner Brug A/S
|
|
1982 - 1985
|
: Deputy General Manager, Engineering / Construction and Offshore Division
Direct involvement in following projects:
1984: Kværner Flowline Joint Venture
Participating in a strategy study regarding flowline bundles and subsea technology.
1983 - 1984: Nordsjøhallen Haugesund
Responsible for the turn-key delivery of steel structures and cladding including
design work, purchasing and subcontracting, fabrication and erection
1982 - 1983: Textile factory complex Morogoro Tanzania
Responsible for all work related to delivery and erection of 70.000 sqm. roof structures.
|
|
1978 - 1982
|
: Deputy General Manager, Steel construction division
Main responsibility for the technical management of the division, handling
deliveries of large workshop buildings, industrial steel buildings and water control
equipment (dam gates).
Direct involvement in following projects:
1981 - 1982: Statfjord "C" - GBS
Responsible for the design of deck structures in the riser shaft.
1978 - 1979: Statfjord "B" - Truss structure
Works related to shopdrawings; design of lifting arrangement for truss assembly;
design of skidding equipment.
1977: Statfjord "A" -ALP
Design responsibility of fabrication support structures and launching equipment
for the Articulated Loading Platform.
|
|
1975 - 1977
|
: Department Manager, Steel construction division
Responsibble for the design department for steel structures, preparing technical
specifications and tender documentation, doing design calculations and MTO's,
subcontracting, follow up and cost control.
|
|
1973 - 1974
|
: Project Engineer, Steel construction division.
Responsible for preparation of project drawings and workshop drawings, follow up, contact
with clients and subcontractors, purchasing and cost control.
|
|
1971 - 1973
|
: Sivilingeniør Elliot Strømme A/S
Project Engineer, Structural steel division
|
|
|
Preparation of proposals consisting of preliminary design and cost estimates.
Preparation of technical specifications and drawings for tender documents.
Responsibility for design calculations, tender drawings and shopdrawings.
|