Experience
|
|
1987 - present
|
Teknisk Design A/S
|
|
Oct 09 - Present
|
Client: AF Decom / Ekofisk EPRD project
Design of topside modules on FPSO
Assigned as structural specialist engineer during detail design engineering of Offshore Hook Down and Disposal Engineering Vats Site
|
|
Sept 07 - Oct 09
|
Client: Aker Solutions / Idun/Skarv topside project
Design of topside modules on FPSO
Assigned as Specialist engineer outfitting structures
|
|
Feb 06 - Dec 07
|
Client: Aker Kværner E & T / H-6e project
Topside structure
Assigned as specialist engineer
Design of deck houses and major equipment support structures with interface tasks towards drilling rig construction team.
The design has been done with extended use of STAADPro programme package for analysis, and PDMS 3D-model for design including checking activities up to IFC-drawings.
|
|
Feb 06 - May 06
|
Client: Technip Offshore Norge A/S / Shtokman Consept Study
Structural responsible engineer in the SPAR topside design team
|
|
Oct 04 - May 07
|
Client: AF Decom / Ekofisk 2/4T Demolition project
Removal of Topside structures
Assigned as structural responsible engineer during detail design engineering and follow on period
Structural verification of platform structures for load from demolition machinery and crawler crane. Design of dedicated load distribution platforms on top of deck structures
Dropped object consequence report and recommendations for possible protective actions to minimize consequences of dropped items
Design of dedicated container trolley for use on the platform
Sea fastening and lifting design reports for machinery and equipment to be transported to and from the Ekofisk tank
Structural responsibility of special operations during the demolition process requiring stability and/or capacity verification design reports
In addition structural responsible for several land based demolition tasks with special attention to structural stability and risk of human life and/or material damage with major cost consequences:
Ikea Slependen
Norsk Hydro Høyanger
Norsk Hydro Årdalstangen
|
|
December 03 - May 05
|
Client: Aker Kværner E & T / Tyrihans project
Kristin topside modification
Assigned as structural responsible for outfitting structures.
|
|
April 02 - Dec 03
|
Client: Aker Kværner Engineering / Kristin project
Topside structure
Assigned as Specialist Engineer
Group lead process module / responsible for:
Secondary and outfitting structures.
Equipment support design.
The design has been done with extended use of STAADPro programme package for analysis, and PDMS 3D-model for design including checking activities up to AFC-drawings.
|
|
Oct 01 - March 02
|
Client: ABB Offshore Systems / Kvitebjørn project
Structural responsible for study work related to replacement of export pump package on Kvitebjørn platform topside structure. Also participating in design work for the structural group related to hook-up activities for different structures.
|
|
March 01 - Aug 03
|
Client: Kværner Oil & Gas / Mikkel project
Åsgard B Modification
Assigned as structural responsible (part-time)
Structural responsible for design and modification work on Åsgard B platform in connection with Mikkel tie in.
Design of structures for lifting and skidding the new heater (30 tonnes) into riser balcony cellar deck.
|
|
Sept 00 - Sept 01
|
Client: Kværner Oil & Gas / Grane project
Topside Structure
Assigned as specialist engineer
Design responsibilities:
External areas including piperacks
Bridge landing (hook-up design)
Lay-down areas (hinged design)
HVAC room / lifeboat support structure
The design has been done with extended use of STAAD programme
package for analysis and PDMS 3D-model for design including checking
activities up to AFC-drawings.
|
|
May 97 - Sept 00
|
Client: Kværner Oil & Gas / Åsgard B project
Central Engineering Team
Assigned as specialist engineer
May 97 - April 99: Structural group upper hull
Responsible for:
Deck structure design
Equipment support design
Discipline coordinator for equipment support
Discipline coordinator for vendor documents IDC-work
May 99 - March 00: Structural group
Field design / follow on engineering
Working with late design activities at Rosenberg Yard in Stavanger including follow on design report.
July 00 - Sept 00: Structural group Statoil Hamang
Working as structural representative in connection with offshore completion of platform.
|
|
Dec. 97 - April 98
|
Client: Kværner Maritime / Ocean Confidence
Design assistance / main scantling work of deck and bulkhead structure
with main task to verify the global buckling capacity.
|
|
July 96 - May 97
|
Client: Kværner Engineering / Oseberg Øst project Topside structure
Assigned as specialist engineer
|
|
|
Responsible for:
Secondary and outfitting structures design
Equipment support design
|
|
Aug. 95 - Sept. 96
|
Client: Kværner Engineering / Ekofisk II project Main Support Frame
Assigned as specialist engineer
|
|
|
Responsible for:
Deck structure design
Equipment support design
Hook-up design of caissons etc. between MSF and Jacket
Discipline coordinator for equipment support design
Discipline coordinator for vendor documents IDC-work
|
|
Nov. 94 - July 95
|
Client: Kværner Family Venture / Norne project
Gas Compression package EPC contract Assigned as specialist engineer
|
|
|
Responsible for:
Design of the modules deck structure and outfitting structures
"Follow up" of equipment information with respect to structural interface
Interdiscipline coordination
|
|
Aug. 94 - Nov. 94
|
Client: Kværner Concrete Construction / Njord project
Design development / main scantling of deck structure for a concrete semi
|
|
June 93 - Sept. 94
|
Client: Kværner Engineering / Sleipner Vest project
Modules M11 and M12
Assigned as senior engineer
|
|
|
Responsible for:
Design of the internal deck structures including equipment supports, pipe supports /
pipe racks, runway beams / lifting lugs, access platforms
Interdiscipline work
Discipline responsibility for commenting on, and filing of supplier documents
Design reports
|
|
Aug. 91 - July 93
|
Client: Aker Engineering / Troll Gass project
Topside structure
Assigned as senior engineer
1991: Preengineering stage I
1991-1993: Detail engineering stage II
1993: Follow on engineering stage III
|
|
|
Design responsibility for external areas including stairtowers and equipment supports
Interdiscipline work
Assistance to site team solving fabrication queries
|
|
Feb. 91 - Sept. 91
|
Client: Kværner Engineering / Brage project
M10 - Production module
Assigned as senior engineer
|
|
|
Responsible for the design of external areas including equipment supports,
access platforms, external piperacks.
Interdiscipline work
Detail design reports
|
|
Apr. 88 - Oct. 92
|
Client: Aker Engineering / Snorre project
Topside and Hull structures
Assigned as senior engineer
Apr. - Aug. 1988: Structural group Topsides
Design of secondary deck structures
Aug. 1988 - June 1989: Structural group Hull
Responsible for engineering of secondary and outfitting structures
throughout the Hull including interdiscipline responsibility.
Partisipating in work with detail design reports for various main
structures of the Hull.
July 1989 - Jan. 1991: Structural group
Follow on engineering
Responsible for writing the design resume for Hull and Well Template
Febr. 1991 - Oct. 1992: Snorre PT
(parttime available - structural group)
Follow on engineering during fabrication period, inshore period, tow out
and offshore completion.
Punch out activities w.r.t. seafastening of components in the mooring
compartment before tow out.
Close out activities
|
|
1987 - 1994
|
Client: Kværner Energy, Oslo
|
|
|
Structural design / shopdrawing work for miscellaneous steel building
structures.
Design work / calculations of single skid support frames for gas turbine
generator packages for installation on offshore platforms.
Design work / verification of system spring values for different GE gas
turbine support structures.
|
|
1985 - 1987
|
ACN - Articulated Columns Norway A.S
|
|
1987
|
Project Manager
Gullfaks SPM Post-Engineering.
Client: Statoil
Responsible for the daily administration and management of the post-engineering
project in its final phase including complete close out documentation for
technical and financial matters.
|
|
1986
|
Engineering Manager.
Responsible for management of engineering resources within ACN. In particular
responsible for the efficient use of manpower cooperating with the project managers
regarding assignment and demobilization of engineering personnel to match workload.
From 1987 responsible for the technical management within ACN together with the
Technical Manager.
Project Manager.
Draugen Field Engineering Studies.
Client: A/S Norske Shell.
Responsible for conceptual studies for a Floating Production Storage and Offloading unit,
a Floating Storage and Offloading unit and a Floating Loading Platform.
|
|
1985
|
Senior structural engineer.
Gullfaks SPM Post-Engineering.
Client: Statoil
Responsible for the structural engineering discipline.
|
|
1985
|
Project Engineer
Statfjord "A" SPM Project.
Client: Statoil
Responsible for the technical part of the tender for a new SPM loading platform
on the Statfjord field, being a potential turn-key delivery with ACN as main
contractor. Due to very short delivery time, much effort was put in producing engineering
documents during the tender period. During tender clarification period - up to
december 1985, it was continously worked on the documentation, completing engineering
documents including document list and reporting format.
|
|
1973 - 1985
|
: Kværner Brug A/S
|
|
1982 - 1985
|
Deputy General Manager, Engineering / Construction and Offshore Division
Direct involvement in following projects:
1984: Kværner Flowline Joint Venture
Participating in a strategy study regarding flowline bundles and subsea technology.
1983 - 1984: Nordsjøhallen Haugesund
Responsible for the turn-key delivery of steel structures and cladding including
design work, purchasing and subcontracting, fabrication and erection
1982 - 1983: Textile factory complex Morogoro Tanzania
Responsible for all work related to delivery and erection of 70.000 sqm. roof structures.
|
|
1978 - 1982
|
Deputy General Manager, Steel construction division
Main responsibility for the technical management of the division, handling
deliveries of large workshop buildings, industrial steel buildings and water control
equipment (dam gates).
Direct involvement in following projects:
1981 - 1982: Statfjord "C" - GBS
Responsible for the design of deck structures in the riser shaft.
1978 - 1979: Statfjord "B" - Truss structure
Works related to shopdrawings; design of lifting arrangement for truss assembly;
design of skidding equipment.
1977: Statfjord "A" -ALP
Design responsibility of fabrication support structures and launching equipment
for the Articulated Loading Platform.
|
|
1975 - 1977
|
Department Manager, Steel construction division
Responsibble for the design department for steel structures, preparing technical
specifications and tender documentation, doing design calculations and MTO's,
subcontracting, follow up and cost control.
|
|
1973 - 1974
|
: Project Engineer, Steel construction division.
Responsible for preparation of project drawings and workshop drawings, follow up, contact
with clients and subcontractors, purchasing and cost control.
|
|
1971 - 1973
|
Sivilingeniør Elliot Strømme A/S
Project Engineer, Structural steel division
|
|
|
Preparation of proposals consisting of preliminary design and cost estimates.
Preparation of technical specifications and drawings for tender documents.
Responsibility for design calculations, tender drawings and shopdrawings.
|