P R T Description
*AEXEC01CTotal Field Development - All Resourses - Cost USD; Input: Production rate, Type
*AEXEC19XTotal Field Development Duration - Months; Input: Cost and Platform type
*AAEXEC03ATopside Oil Platform, Unstab. Oil - All Material -Weigt MT; Input:Production, GOR, WI
*AAEXEC04ATopside Oil Platform, Stabiliz. Oil - All Resources -Weight MT; Input:Production, GOR
*AAEXEC01ATopside Gas Platform - All Material - Weigt MT; Input:Production, Type
*AAEXEC05ATopside Production Platform - All Resources - Weight MT; Input: Power Consumpt.
*AAEXEC02ATopside Gas and Condensate Platform - All Material - Weight MT; Input: Product.Rates
*AAEXEC06ATopside Gas and Oil Platform - All Material - Weigh MT; Input: Product Rates
*AAEXEC11ATopside - All Material - Weight Distribution; Input: n/a -WD
*AAEXEC17ATopside - Operational Weights - Factor; Input: n/a- WD
*AAEXEC03CTopside Oil Platform, - All Resources - Cost USD; Input: Weight
*AAEXEC20CTopside - Modification, All Resources - Cost USD; Input: Equipment Weight
*AAEXEC01CTopside Gas Platform - All Resources - Cost USD; Input: Gas Production
*AAEXEC02CTopside Oil Platform - All Resources - Total Cost USD; Input: Oil production
*AAAEXEC12ATopside Drilling Facilities - All Material - Weight Distribution; Input: n/a
*AAAAEXEC13ATopside Well Head Area - All Material - Weight Distribution; Input: n/a
*AAACEXEC14ATopside Mud Area - All Material - Weight Distribution; Input: n/a
*AABCEXEC15ATopside Process Area - All Material - Weight Distribution; Input: n/a
*AABEEXEC18ATopside FPSOs - All Material - Weight Distribution; Input: n/a
*AACAEXEC16ATopside Water Injection Area - All Material - Weight Distribution; Input: n/a
*AADEXEC17ATopside Utility Area - All Material - Weight Distribution; Input: n/a
*AADAEXEC18ATopside Power Generation Area - All Material - Weight Distribution; Input: n/a
*AAFAEXEC19ATopside Living Quarters - All Material - Weight Distribution; Input: n/a
*AAFAEXEC05ATopside Living Quarters - All Material - Weight MT; Input: Number of Beds
*ABAEXEC01CSteel Jacket - All Resources - Cost USD; Input:Topside Load and Water Depth,
*ABAEAEXEC01CProduction/Export Risers - All Resourses - Cost USD/ea; Input:Type, Dimensions
*ABBEXEC01CConcrete GBS Hull - All Resources - Cost USD; Input: Water Depth, Topside Load
*ABCEXEC01CSemi Submergible Hull - All Resources - Cost USD; Input: Weight Topside or Hull
*ABDEXEC01CTLP Substructure Hull - All Resources - Cost USD; Input: Weight Topside or Hull
*ABEEXEC01CFPSO Hull w/Mooring - All Resources - Cost USD; Input: Storage Capacity
*ACEXEC01CSingle Subsea Wells - All Resourses - Cost USD; Input: Type
*ACAEXEC01CProduction Drilling Operations - All Resources - Cost USD; Input:No.Wells, Water Dpt
*ADAAEXEC01CSubsea Production Template - All Resources - Cost USD; Input:Composition
*ADAAEXEC02CSubsea Inject.Template - All Resources - Cost USD; Input:Quantity
*ADJEXEC01CSubsea Umbilical - All Resources - Cost USD; Input: Lenght
*ADMAEXEC01CSubsea Flowline - All Resources - Cost USD; Input: Lenght, Trenched Length, Diameter
*ADOEXEC01CPredrilling Template - All Resources - Cost USD; Input: Number of slots
*AEAEXEC01XSubsea Pipeline - Nominal Diameter - Inches ; Input: Capasity, lenght , pressure
*AEAEXEC01CSubsea Pipeline - Overall Cost - USD; Input: Capasity, lenght , pressure
*AECAEXEC01CFSO (Storage) Hull w/Mooring - All Resources - Cost USD; Input: Storage Capacity
*AHCOffshore Overall - Management & Administration Overall - USD/Whr; Input: Factor
*AKCOffshore Overall - Engineering Work - USD/Whr; Input: Country Factor
*AMCOffshore Overall - Equipment Total - USD/MT; Input: Area
*AMECOffshore Overall - Electrical Equipment - USD/MT; Input: Equipment Class/Type
*AMEGAOffshore Overall - Power Generators - Weight MT; Input: Power Output, drive
*AMEG01COffshore Overall - Power Generators - USD/MT; Input: Type factor
*AMEG02COffshore Overall - Power Generators - USD; Input: Power Output, type
*AMETCOffshore Overall - Main Power Transformers - USD/MT; Input: n/a
*AMGCOffshore Overall - HVAC Equipment - USD/MT; Input: Equipment Class/Type
*AMHCOffshore Overall - Heat Transfer Equipmet - USD/MT; Input: Equipment Class/Type
*AMHBAOffshore Overall - Gas Coolers - Weight MT; Input: Duty, Operating Pressure
*AMJIAOffshore Overall - Gas Metering Skidd - Weight MT; Input: Duty in SM3/SD
*AMJCOffshore Overall - Instrument Equipmet - USD/MT; Input: Equipment Class/Type
*AMKCOffshore Overall - Compressors - USD/MT; Input: Equipment Class/Type
*AMKAAOffshore Overall - Centrifugal Compressor - Weight MT; Input: Duty in KW, Bara
*AMKACOffshore Overall - Centrifugal Compressor - USD; Input: Duty in KW, Bara
*AMKBAOffshore Overall - Resiprocating Air Compressor - Weight MT; Input: Duty in M3/hr
*AMKBCOffshore Overall - Resiprocating Air Compressor - USD; Input: Duty in M3/hr
*AMM01COffshore Overall - Material Handling Equipment - USD/MT; Input: Equipment Class/Type
*AMMAAOffshore Overall - Pedestal Crane - Weight MT; Input: None
*AMPAAOffshore Overall - Centrifugal Pumps - Weight MT; Input: Duty
*AMPACOffshore Overall - Pumps - USD; Input: Duty in KW
*AMPCOffshore Overall - Pumps - USD/MT; Input: Class, NPSH, Driver
*AMTCOffshore Overall - Atmospheric Tanks - USD/MT; Input: Equipment Class/Type, Material
*AMVCOffshore Overall - Pressure Vessels - USD/MT; Input: Equipment Class/Type, Material
*AMVAAOffshore Overall - Production & Test Separators - Weight MT; Input: Volume, Pressure
*AMVDAOffshore Overall - Drums - Weight MT; Input: Dimension, Pressure
*AMVGAOffshore Overall - Scrubbers - Weight MT; Input: Dimension, Pressure
*AMVKCOffshore Overall - Air Dryer - USD/MT; Input: Weight
*AMXCOffshore Overall - Packaged Equipment - USD/MT; Input: Equipment Class/Type
*AXBCOffshore Overall - Marine Vessels Rental - USD/Day; Input: Factor
*AABBOffshore Overall - Insurance - Load factor; Input: Topside Bulk and Equipment cost
*AACBOffshore Overall - Material Freight - Load factor; Input: Total material Cost (E+B+N)
*ABECOffshore Overall - Electrical Bulk - USD/MT; Input: Material Class
*ABGCOffshore Overall - HVAC Bulk - USD/MT; Input: Material Class
*ABJCOffshore Overall - Instrument Bulk - USD/MT; Input: Material Class
*ABLCOffshore Overall - Pipes& Tubes w/ Fittings, Support - USD/MT; Input: Material Class
*ABNCOffshore Overall - Structural Steel Materials - USD/MT; Input: Material Class
*ABRCOffshore Overall - Paint and Anodes Bulk - USD/MT; Input: Material Class
*ABSCOffshore Overall - Safety Bulk - USD/MT; Input: Equipment Class/Type
*ABUCOffshore Overall - Insulat.& Fire Protection Material - USD/MT; Input: Material Class
*ABZCOffshore Overall - Architectural Bulk - USD/MT; Input: Material Class
*AAHBTopside Overall - Management & Administration - Whrs/MT; Input: Job Size in MT
*AAKBTopside Overall -Engineering Work Overall - Whrs/MT; Input: Job Size in MT
*AALCTopside Overall - Overall Work - USD/Whr; Input: Country Factor,
*AAL01BTopside Overall - Offshore Work Overall - Whrs/MT; Input: Job Size in MT, Factor
*AALCOMBTopside Overall - Onshore/Offshore Commissioning Overall - Whrs/MT; Input: N/A
*AALHOOKBTopside Overall - Onshore/Atshore Hook-up Overall - Whrs/MT; Input: Job Size in MT
*AALEBTopside Overall - Electrical Work - Whrs/MT; Input: Job Size in MT
*AALGBTopside Overall - HVAC Work - Whrs/MT; Input: Job Size in MT
*AALJBTopside Overall - Instrumentation Work - Whrs/MT; Input: Job Size in MT
*AALLBTopside Overall - Piping Work - Whrs/MT; Input: Job Size in MT
*AALMBTopside Overall - Mechanical Work - Whrs/MT; Input: Job Size in MT
*AALNBTopside Overall - Structural Work - Whrs/MT; Input: Job Size in MT
*AALRBTopside Overall -Surface Protection Work - Whrs/MT; Input: Job Size in MT
*AALSBTopside Overall - Fire and Safety Work - Whrs/MT; Input: Job Size in MT
*AALZBTopside Overall - Architectural Work - Whrs/MT; Input: Job Size in MT
*AAALSBTopside Drilling Area - Safety Facilities Work - Whrs/MT; Input: Job Size in MT
*AAALBTopside Drilling Area - Overall Work - Whrs/MT; Input: Job Size in MT
*AAALEBTopside Drilling Area - Electrical Work - Whrs/MT; Input: Job Size in MT
*AAALGBTopside Drilling Area - HVAC Work - Whrs/MT; Input: Job Size in MT
*AAALJBTopside Drilling Area - Instrumentation Work - Whrs/MT; Input: Job Size in MT
*AAALLBTopside Drilling Area - Piping prefab & Inst Work - Whrs/MT; Input: Job Size in MT
*AAALMBTopside Drilling Area - Mechanical Installation Work - Whrs/MT; Input: Job Size in MT
*AAALNBTopside Drilling Area - Structural Work - Whrs/MT; Input: Job Size in MT
*AAALRBTopside Drilling Area - Surface Protection Work - Whrs/MT; Input: Job Size in MT
*AAALZBTopside Drilling Area - Architectural Work - Whrs/MT; Input: Job Size in MT
*AABLBTopside Process Area - Overall Work - Whrs/MT; Input: Job Size in MT
*AABLEBTopside Process Area - Electrical Work - Whrs/MT; Input: Job Size in MT
*AABLGBTopside Process Area - HVAC Work - Whrs/MT; Input: Job Size in MT
*AABLJBTopside Process Area - Instrumentation Work - Whrs/MT; Input: Job Size in MT
*AABLLBTopside Process Area - Piping prefab & Inst Work - Whrs/MT; Input: Job Size in MT
*AABLMBTopside Process Area - Mechanical Installation Work - Whrs/MT; Input: Job Size in MT
*AABLNBTopside Process Area - Structural Work - Whrs/MT; Input: Job Size in MT
*AABLRBTopside Process Area - Surface Protection Work - Whrs/MT; Input: Job Size in MT
*AABLSBTopside Process Area - Safety Facilities Work - Whrs/MT; Input: Job Size in MT
*AABLZBTopside Process Area - Architectural Work - Whrs/MT; Input: Job Size in MT
*AABBNATopside Process Area - Structural Steel - Weigh MT; Input: Module Volume M3
*ABALRBSteel Jacket Structure - Surface Protection Work - Whrs/MT; Input: Job Size in MT
*ABAABASteel Jacket Structure - Overall Structure Exc.Piles - MT; Input: Water Depth, Load
*ABAALNBSteel Jacket Structure - Structural Work - Whrs/MT; Input: Job Size in MT, Type
*ABABLNBSteel Jacket Structure - Misc. Fabrication - Whrs/MT; Input: Job Size in MT
*ABACLNBSteel Jacket Structure - Buoyancy Tank Fabrication - Whrs/MT; Input: Job Size in MT
*ABADLNBSteel Jacket Structure - Pile Fabrication - Whrs/MT; Input: Job Size in MT
*ABCLBSemi Submergible Hull - Overall Work - Whrs/MT; Input: Job Size in MT
*ABCLNBSemi Submergible Hull Structure - Structural Work - Whrs/MT; Input: Job Size in MT
*ABDLBSteel TLP Hull - Overall Work - Whrs/MT; Input: Job Size in MT
*ABDLNBSteel TLP Hull Structure - Structural Work - Whrs/MT; Input: Job Size in MT
*ABELCMono Hull Structure(FPSO) - Overall Work - USD/Whr; Input: Country Factor
*ABELNBMono Hull Structure(FPSO) - Structural Work - Whrs/MT; Input: Job Size in MT
*AAFLBTopside Living Quarters - Work Overall - Whrs/MT; Input: Job Size in MT
*AAFLEBTopside Living Quarters - Electrical Work - Whrs/MT; Input: Job Size in MT
*AAFLGBTopside Living Quarters - HVAC Work - Whrs/MT; Input: Job Size in MT
*AAFLJBTopside Living Quarters - Instrumentation Work - Whrs/MT; Input: Job Size in MT
*AAFLLBTopside Living Quarters - Piping prefab & Inst Work - Whrs/MT; Input: Job Size in MT
*AAFLMBTopside Living Quarters - Mechanical Work - Whrs/MT; Input: Job Size in MT
*AAFLNBTopside Living Quarters - Structural Work - Whrs/MT; Input: Job Size in MT
*AAFLRBTopside Living Quarters - Surface Protection Work - Whrs/MT; Input: Job Size in MT
*AAFLZBTopside Living Quarters - Architectural Work - Whrs/MT; Input: Job Size in MT
*BABCTotal Onshore - Insurance - Cost Factor; Input: Factor Value
*BACCTotal Onshore - Freight - Cost Factor; Input: Factor Value
*BAGCTotal Onshore - Equipment Testing - Cost Factor; Input: Factor Value
*BBECTotal Onshore - Electrical Bulk Materials - Cost; Input: Cost USD/unit
*BBJ01CTotal Onshore - Instrument Bulk, Rotating Equip - Cost ; Input: Cost USD/unit
*BBJ02CTotal Onshore - Instrument Bulk, Vessels - Cost ; Input: Cost USD/unit
*BBJ03CTotal Onshore - Instrument Bulk, Heat Exch. - Cost ; Input: Cost USD/unit
*BBJ04CTotal Onshore - Instrument Bulk, Columns - Cost ; Input: Cost USD/unit
*BBL01CTotal Onshore - Pipe Run Materials <2" - Cost ; Input: Size
*BBL02CTotal Onshore - Pipe Run Materials >2,<8" - Cost ; Input: Size
*BBL03CTotal Onshore - Pipe Run Materials >8" - Cost ; Input: Size
*BBL08CTotal Onshore - Orifice Plates <2" - Cost ; Input: Size
*BBL09CTotal Onshore - Orifice Plates 2-8" - Cost ; Input: Size
*BBL10CTotal Onshore - Orifice Plates >8" - Cost ; Input: Size
*BBL11CTotal Onshore - Gate Valves - Cost ; Input: Size
*BBL12CTotal Onshore - Globe Valves - Cost ; Input: Size
*BBL12CTotal Onshore - Plug Valves - Cost ; Input: Size
*BBL15CTotal Onshore - Relief Valves - Cost ; Input: Size
*BBQA02CTotal Onshore - Equipment Foundations in Concrete - Cost ; Input: Size
*BBN01CTotal Onshore - Secondary Steel Structures- Cost Factor ; Input: Cost USD
*BBR02CTotal Onshore - Painting Materials - Cost USD ; Input: Material/Equipment Cost USD
*BBU01CTotal Onshore - Cladding Materials- Cost USD ; Input: Volume
*BBU02CTotal Onshore - Insulation Materials Equipment - Cost USD ; Input: Volume
*BBU04CTotal Onshore - Insulation Materials Piping - Cost USD/ft ; Input: Volume
*BMC01CTotal Onshore - Cooling Water Plant - Cost USD ; Input: Capacity
*BMC02CTotal Onshore - Process Water Plant - Cost USD ; Input: Capacity
*BMC05CTotal Onshore - Steam Generating Plant - Cost USD ; Input: Capacity
*BMC06CTotal Onshore - Inert Gas Generating Plant - Cost USD ; Input: Capacity
*BMC11CTotal Onshore - Boiler Feded Water Plant - Cost USD ; Input: Capacity
*BMC12CTotal Onshore - Refrigeration Plant - Cost USD ; Input: Capacity
*BMF01CTotal Onshore - Direct Fired Heaters - Cost USD ; Input: Duty
*BMF02CTotal Onshore - Process Furnace Heaters - Cost USD ; Input: Duty
*BMH01CTotal Onshore - Heat Exchangers - Cost USD ; Input: Size
*BMKA01CTotal Onshore - Compressors - Cost USD ; Input: Duty
*BMM01CTotal Onshore - Agitators - Cost USD ; Input: Size
*BMT01CTotal Onshore - Spherical Tanks - Cost USD ; Input: Size
*BMT02CTotal Onshore - Large Cylindrical Tanks - Cost USD ; Input: Size
*BMT03CTotal Onshore - Small Tanks - Cost USD ; Input: Size
*BMV01CTotal Onshore - Pressure Vessels - Cost USD ; Input: Size
*BMV04CTotal Onshore - Pressure Vessels Trays - Cost USD ; Input: Size
*BMV06CTotal Onshore - Pressure Vessels Packing Materials - Cost USD ; Input: Size
*BMV07CTotal Onshore - Pressure Vessels Lining Materials - Cost USD ; Input: Size
*BKA01CTotal Onshore - Engineering and Management - Cost; Input: CAPEX
*BLE01BTotal Onshore - Electrical Installations - Whrs/MW; Input: MW
*BLJ01BTotal Onshore - Instrument Installations - Whrs/MW; Input: El. Power Consumption
*BLL01BTotal Onshore - Pipe Installations <2" - Whrs/ft; Input: Size, quantity
*BLL02BTotal Onshore - Pipe Installations 2-6" - Whrs/ft; Input: Size, quantity
*BLL03BTotal Onshore - Pipe Installations >6" - Whrs/ft; Input: Size, quantity
*BLL11BTotal Onshore - Valve Installations - Whrs/ea; Input: Size, rating
*BLMV01BTotal Onshore - Tray Installations - Whrs/ea; Input: Size, rating
*BLMV02BTotal Onshore - Packing Installations - Whrs/ea; Input: Weight, nos.
*BLMK03BTotal Onshore - Compressor Installations - Whrs/ea; Input: Power, Type
*BLMHK05BTotal Onshore - Vessel Installations- Whrs/ea; Input: Weight, Type
*BLMH05BTotal Onshore - Heat Exchanger Installations - Whrs/ea; Input: Weight, Type
*BLMV08BTotal Onshore - Vessel w/Agitator Installation - Whrs/ea; Input: Weight, Type
*BLNB01BTotal Onshore - Outfitting Steel Tanks/Vessels- Whrs/ea; Input: Size
*BLQ01BTotal Onshore - Civil Foundation Work - Whrs/ea; Input: Type, Size
*BCX01BTotal Onshore - Field Labour Overhead - Factor; Input: Type, Size
*BLCTotal Onshore - Overall Work - USD/Whr; Input: Country Factor,
*BKCTotal Onshore - Engineering Work - USD/Whr; Input: Country Factor
*BLNBTotal Onshore - Overall Structural Work - Whrs/MT; Input: Job Size in MT
*BLMBTotal Onshore - Overall Equipment Installation Work - Whrs/MT; Input: Job Size in MT
*BMP01CTotal Onshore - Pumps - Cost USD ; Input: Size
*BLMP01BTotal Onshore - Pumps Installation - Whrs/ea ; Input: Size
*BHCTotal Onshore - Management & Administration Overall - USD/Whr; Input: Factor
*BMEGATotal Onshore - Power Generators - Weight MT; Input: Power Output, drive
*BMETCTotal Onshore - Main Power Transformers - USD/MT; Input: n/a
*BACBTotal Onshore - Material Freight - Load factor; Input: Total material Cost (E+B+N)
*BLRBTotal Onshore -Surface Protection Work - Whrs/MT; Input: Job Size in MT
*BLSBTotal Onshore - Fire and Safety Work - Whrs/MT; Input: Job Size in MT
*BMEGCTotal Onshore - Power Generators - USD; Input: Power Output, type